7 Years

Partnership since 2019

16 Projects

Each won in competitive tender

2 countries

Same standard delivered in both

#situation

The Situation Proven at Scale. Trusted at Every Stage.

In 2019, the operator began building its second generation of data centers. It wanted one integrator that was vendor-agnostic, agile enough to adapt as designs evolved, experienced in data center monitoring, and able to scale across Australia. It chose Orise.

The operator builds and runs Tier IV data centers and promises its tenants 100% uptime. Orise delivers the critical systems monitoring behind that promise: the system that watches every breaker, chiller and generator, and raises the alarm before a fault becomes an outage. Our scope runs from design and engineering through commissioning and lifecycle support.

Tested at every stage. Every stage was reviewed by the operator’s builder, a technical consultant and a cost consultant. Sixteen times, they chose Orise again. That is the operator’s verdict.

#challenge

The Challenge Scale Fast, Never Drop the Standard.

Building at this pace brought three pressures to every stage:

  • A design that kept moving.
    The operator innovates constantly, and tender specifications could not keep up with the design.
  • Commissioning that never stopped.
    One 16-week block at the end of a stage became two data halls handed to tenants every 4 to 6 weeks.
  • A market short of engineers.
    Skilled controls engineers are scarce, and each new stage needed more of them.

And every stage went back out to tender. Winning once was never enough.

#solution

The Orise Solution:
5 Principles, Proven on 16 Projects.

The full case study shows how each principle played out on this project. Download Below.

01 · Start Small

Earn the next stage.

You don’t have to bet a campus on us. Start with one hall, a retrofit or a service contract, and judge our delivery first-hand.

02 · Design

Get it right the first time.

Problems are found on paper, not on site, so you avoid rework and late changes.

03 · Pace

Commission at the speed of your tenants.

Capacity goes live when your tenants are ready to move in, not when the integrator is.

04 · Team

Build the team the market lacks.

Your project is staffed by people who know critical control systems, even in a tight labor market.

05 · Service

Stay after handover.

One partner from design to day 1,000, not a vendor who leaves at handover.

#download

Read Exactly How It Was Done

Proven at scale. Trusted at every stage. Get the full case study.