| 43 checks across GAMP 5, 21 CFR Part 11, EU GMP Annex 11 and PIC/S data integrity — plus an 8-point readiness check for the 2025 draft Annex 11 and the new Annex 22 on AI.
|
| Most GxP computerised systems pass their own validation testing. What trips teams up in an inspection is the implementation: interfaces left outside validation scope, audit trails that never captured the previous value, access reviews that were never scheduled, a restore that was never tested.
|
| GAMP 5 · 21 CFR PART 11 · EU ANNEX 11 · ICH Q9(R1) · PIC/S PI 041-1 |