43 checks across GAMP 5, 21 CFR Part 11, EU GMP Annex 11 and PIC/S data integrity — plus an 8-point readiness check for the 2025 draft Annex 11 and the new Annex 22 on AI.

 

Most GxP computerised systems pass their own validation testing. What trips teams up in an inspection is the implementation: interfaces left outside validation scope, audit trails that never captured the previous value, access reviews that were never scheduled, a restore that was never tested.

 

GAMP 5   ·    21 CFR PART 11   ·   EU ANNEX 11   ·    ICH Q9(R1)   ·   PIC/S PI 041-1